|
Ennore Port Limited has been endowed with large chunks of land. The Port would have
about 2000 acres of land.
EPL would provide all the infrastructure facilities required viz., water supply,
electricity, transmission corridor, fire fighting services, environmental protection
measures etc.
The facilities available at Ennore Port are
 | |  | |
| Berths |
Capacity |
Max Permissible Length (in meters) |
Max Permissible Draught (in
meters) |
Date of Survey |
Type of Cargo |
Size/Type of Vessels |
|
CB1
|
8 MTPA |
240 |
13.5 |
Aug 10 |
Thermal Coal |
65,000-77,000 DWT |
|
CB2 |
4 MTPA |
240 |
13.5 |
Aug 10 |
Thermal Coal |
65,000-77,000 DWT |
|
MLT1 |
3 MTPA |
260 |
13.5 |
Aug 10 |
POL / Chemicals |
up to 1,50,000 DWT |
|
CICT |
8 MTPA |
260 |
13.5 |
Mar 11 |
Coal (other than TNEB) |
up to 1,50,000 DWT |
| |  | |  |
 | |  | |
|
Breakwaters
|
|
South
|
1070 mtrs
|
|
North
|
3080 mtrs
|
|
Type
|
Rubble-mound with accropode armour protection
|
| |  | |  |
 | |  | |
|
Approach Channel
|
|
Length
|
3775 mtrs
|
|
Width
|
250 mtrs
|
|
Depth
|
16 mtrs BCD
|
|
|
Turning Basin
|
|
Diameter
|
600 mtrs
|
|
Depth
|
15.5 mtrs BCD
|
|
-
|
-
|
|
| |  | |  |
 | |  | |
|
Port Crafts
|
|
Tugs
|
3 nos.(40 tone Bollard Pull)
|
|
Pilot Launches
|
2 nos
|
|
Mooring Launches
|
3 nos
|
|
High Speed Patrol Boat
|
1 no
|
|
|
Navigational aids
|
|
Fairway Buoy
|
1 no
|
|
Channel Marking Buoys
|
6 nos
|
|
Transit light towers
|
2 nos
|
|
| |  | |  |
|

MASTER PLAN |